Petrolimex Installation No.3 Joint Stock Company (PEN), formerly known as Installation No.3 Company, was established in 1997. In 2002, The company transformed into a Joint Stock Company. Penjico's headquarter is located in Ho Chi Minh City and 06 other branches are located in Nha Be, Ba Hom, Dong Khoi, Can Tho, Da Nang and Hanoi. Penjico mainly functions in construction and installation works in petroleum sector, electric lines and substations, technological pipelines; civil and industrial works, irrigation, public and environmental processing works. PEN has provided consulting services for some typical projects such as Nghi Son 2 project, Long Phu 2 thermal power plant, Vinh Tan thermal power plant, Duyen Hai 3 thermal plant, Nghi Son 1 power plant, Lee & Man power plant, Dong Nai 5 hydropower plant, Song Bung 2 hydropower plant, Xekaman 1 hydropower plant, etc. PEN has been traded on Hanoi Stock Exchange (HNX) since September 25, 2014.